Milton Home Additions Old Milton · Timberlea · Hawthorne Village · Campbellville
One-storey brick bungalow before a second storey
Town of Milton

Home Addition Permits in Milton

What the Town of Milton asks for with an addition permit, how the online application works and which other approvals can apply.

Book a site visit Call 416-995-4534
  • Online application
  • Town fee: $25.13/m² for additions

Do you need a permit for a home addition in Milton?

Yes. The Town of Milton issues residential permits for additions, alterations, secondary suites and new houses.

Needs a building permit

  • Additions of any size, including second storeys
  • Finished basements and interior alterations
  • Secondary suites
  • New window or door openings, including a side door
  • Decks and porches

Usually no permit

  • Painting and decorating
  • New flooring
  • Replacing cabinets with no plumbing changes

Not sure? Ask the Town before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.

What does the Town need with the application?

From the Town's residential permit checklist. Applications missing items may not be accepted.

Site plan

Every building on the lot, setbacks to all property lines, lot coverage, the driveway, and the septic and well if there is one.

Grading plan

Existing and new grades, top of foundation, footing and floor elevations, swales and the direction water drains.

Architectural drawings

Floor plans, elevations, wall sections and spatial separation calculations for the existing house and the addition.

Heating design

Over 25% of the heated area: a design for the whole house. 10% to 25%: the addition. Under 10%: outlet sizes and locations on the drawings.

Forms

The application, the Schedule 1 designer form, a water pipe sizing form and the energy efficiency design summary.

Septic report

On septic, needed when the addition grows the floor area by more than 15%, adds a bedroom or adds fixtures.

How long does an addition permit take in Milton?

Residential permits go through the Town's online services portal.

  1. 1

    Apply online

    Upload PDFs straight from the design software. Files over 10 MB need a secure link from the Town.

  2. 2

    Completeness check

    The Town emails to say the application is accepted or refused, then sends the invoice.

  3. 3

    Full review

    Starts once fees are paid. 10 business days for a complete house application.

  4. 4

    Permit issued

    The Town emails when the permit is ready.

  5. 5

    Inspections

    Nothing gets covered until the inspector passes it.

Brick house with a new one-storey side addition

Which other approvals can apply in Milton?

Some lots need sign-off from another agency before the Town issues the building permit.

  • Conservation Halton or the Grand River Conservation Authority, for lots in their regulated areas
  • The Niagara Escarpment Commission, for work in the Escarpment area
  • Halton Region, for new or changed water and sewer connections or a well
  • The Committee of Adjustment, when the addition needs a minor variance
  • A heritage permit, for designated properties
Book a site visit

Milton addition permit questions

Do I need a permit for an addition in Milton?

Yes. Additions of any size need a building permit from the Town of Milton.

How do I apply?

Online through the Town's online services portal, with PDF drawings and forms.

How much is the permit fee?

The Town's posted fee for a new house or addition is $25.13 per square metre, with a $264.20 minimum. Check the current rate with the Town before you budget.

How long does the review take?

The Building Code gives 10 business days for a complete house application, once fees are paid.

Do I need Conservation Halton approval?

Only if the lot is in a regulated area, such as near a creek or valley. The Town's checklist lists it as an approval to get first.

Who does the electrical permit?

The Electrical Safety Authority, separate from the Town's building permit.

Finished basement living room with a large sectional

Book a site visit

Tell us about your house and what you want to add and we'll call you back to set up a visit.

By sending this, you agree we can share your request with a contractor who serves your area. See our privacy policy.

Start with a look at your house

A site visit shows what your lot allows and what an addition would involve.

Book a site visit 416-995-4534