  • $300 to $500 per sq ft rough budget

Is my house right for a second storey?

It depends on the structure and the zoning. A site visit and an engineer's review answer it.

Foundation

The footings and foundation walls have to carry a second floor. An engineer checks them, and some houses need reinforcing.

Walls and framing

Some walls need new posts or beams so the new load reaches the foundation.

Height limit

The zoning by-law caps how tall the house can be. If the design goes over, it needs a minor variance.

Stairs

A new staircase takes space on the main floor, usually about the size of a small room.

Heating and cooling

The furnace and ducts get checked for the extra floor. Some houses need a bigger unit or a second zone.

Escarpment and creeks

Near the Escarpment or a creek, other agencies may need to sign off first. We check that at the site visit.

How much does a second-storey addition cost?

Rough budgets before HST. The real number comes after a site visit and drawings.

Second-storey addition

$300 to $500per sq ft

Design and permits

Quoted separatelyafter the site visit

At that rate, an 800 sq ft second storey works out to $240,000 to $400,000 before HST.

How does a second-storey project go?

  1. 1

    Site visit

    We look at the house, the lot and how your family wants to use the new floor.

  2. 2

    Structural check

    An engineer reviews the foundation and framing before the design starts.

  3. 3

    Drawings

    Architectural, structural, heating and plumbing design, the zoning review and the permit application, priced after the site visit.

  4. 4

    Permit

    Online through the Town of Milton portal. 10 business days for a complete house application.

  5. 5

    Build

    About 5 to 9 months. The roof comes off first and the new floor gets closed in quickly.

  6. 6

    Inspections

    Nothing gets covered until the inspector passes it.

Before and after example of a bungalow with a second storey added

Second-storey questions

Can I live in the house during a second-storey addition?

Most families move out for part of the build, because the roof comes off and the main floor gets opened up for stairs and structure.

How much does a second-storey addition cost?

$300 to $500 per sq ft before HST as a rough budget. Design and permits are quoted separately.

How long does a second-storey addition take?

2 to 6 months for design and permits, then about 5 to 9 months to build.

Will my foundation hold a second floor?

Some will as they are and some need reinforcing. An engineer checks the footings and walls before anything is drawn.

Is building up cheaper than moving?

It depends on the house and the market. A site visit gives you a real budget to compare against moving costs.

Finished basement living room with a large sectional

Book an addition visit

Tell us about your house and what you want to add and we'll call you back to set up a visit.

By sending this, you agree we can share your request with a contractor who serves your area. See our privacy policy.

Start with a look at your house

A site visit shows what your lot allows and what an addition would involve.

Book a site visit 416-995-4534